As a building and project consultancy, our clients hugely rely on our expertise to take the lead on statutory compliance, including planning consent, building regulations, building safety regulator applications, and advising on action to meet legal requirements, for example fire safety regulations and the highly demanding requirements of the Building Safety Act 2022.

Building Safety Act 2022

The Building Safety Act 2022, effective from 1st April 2023, addresses failures in building safety highlighted by the Grenfell Tower fire. Targeting high-rise residential buildings which are more than 18 metres, or 7 storeys with two or more units, the Act enforces stringent standards for design, construction, and maintenance to prioritise occupant safety and compliance.

BWP has extensive experience in this field, providing expert guidance to ensure clients meet their obligations under the legislation.

Building Safety Case Reporting

A Building Safety Case Report outlines the safety measures for high-rise residential buildings, identifying risks such as fire spread or structural failure and detailing how they are managed.

The Principal Accountable Person is responsible for preparing and updating this report to ensure ongoing compliance and occupant safety. BWP can assist PAPs throughout the process, offering expert guidance and support to develop comprehensive and compliant safety case reports.

Compartmentation & Fire Stopping

Compartmentation and fire stopping are critical for limiting the spread of fire and smoke within buildings, protecting occupants, and ensuring compliance with fire safety regulations.

BWP has extensive experience in assessing and implementing fire safety measures, providing expert guidance to help clients meet regulatory standards and enhance building safety.

Façade Remediation

Façade remediation projects are challenging, technically complex, and costly. Each façade and cladding system requires a tailored approach influenced by various factors, including the main structural form, building size and shape, insulation type, façade materials, combustibility ratings, fire safety measures, window and balcony detailing, and proximity to adjoining buildings or ignition sources such as car parks. Internal compartmentation and fire safety policies also play a critical role. BWP provides expert guidance throughout this process, offering bespoke solutions to address these complexities effectively and ensure compliance with safety standards.

Fire Doors

Fire doors are essential to effective compartmentation. Our surveys include detailed inspections of doors, frames, and seals to ensure compliance with British Standards and building regulations. Issues including damaged door leafs, missing intumescent strips, or faulty closers are identified and documented, supporting safety and regulatory adherence.

Client Feedback

” We have worked with BWP for several years, successfully delivering both large and small projects. A recent example is the Bridge Square project in Lancaster, where BWP expertly managed the replacement of combustible cladding and waterproofing of deck walkways. BWP handled the project with professionalism and skill, ensuring effective collaboration between contractors and sub-contractors. Their communication and precise project management, especially in managing the budget, were crucial to the project’s success. I highly recommend BWP for any project. ”

“Speedy Hire are delighted with the service provided by BWP.  They consistently achieve very advantageous settlements as and when we undertake a Depot closure or relocation. Not only are these secured below expenditure expectations, but BWP also manage the process in a very smooth, professional, thorough and approachable manner throughout.  Minute attention to detail is combined with a commercial and pragmatic approach, and we have total trust in the work carried out on our behalf.

BWP also take care of our contract administration and project management requirements and work closely with our internal property team to ensure that projects are delivered on time and on budget despite difficult projects with tight time constraints.”

Speedy Hire

“We have had the pleasure of working with BWP for several years, and they have played a key role in the development and success of our company, Swim. Most recently, BWP expertly managed the full project for our new swim centre at the Xscape Castleford leisure park. As always, their attention to detail and communication were exceptional, and this particular site presented unique challenges, given the presence of several high-profile retailers and leisure operators within the Xscape centre. Despite these challenges, BWP worked diligently to ensure seamless communication between all contractors and the centre management team. This included managing the delivery of high-value items, coordinating the movement of equipment through the main mall connections, and overseeing night work for essential utilities and services. Additionally, BWP’s control of the budget was exemplary, and the project was completed under the original tendered cost. We highly value our ongoing partnership with BWP and look forward to continuing to work together in the future. ”

“BWP were appointed by Plumlife Management to undertake Project Management works for large scale complex external works at Fairhaven Court in September 2023. They have a track record of working on large scale major works projects, so were the ideal partner for this works programme. As well as providing the surveys and contract administration functions, they also attended Resident Association and Full Resident Meetings at no further charge which was welcome and also provided their expertise which was invaluable at these meetings, as residents as many questions to answer. They have always been proactive in their management of this project and organising what is required to complete the works on me. On this basis I can recommend their future services to the company.”

“From the start of the project the team at BWP were clear and concise in the way they managed the project. This included completing the design phase and then managing the tender process as well as delivering the project from start to finish. All stages were managed exceptionally with the team at BWP always being available to answer questions or queries to support in resolving anything that came up during the project. BWP supported in managing the cashflow and staging of the payments which also helped to ensure we were delivering both financially and operationally. I would recommend BWP to support in any project management works.”

“I am delighted to share my experience with BWP Consultants; their expertise and dedication have been truly exceptional, making them one of the most reliable and proficient consultants in the industry. From the outset, BWP Consultants impressed us with their comprehensive approach and attention to detail. Their consultants possess a profound understanding of the complexities involved in building and project management, and they are adept at navigating the challenges to deliver impeccable results. One of the standout qualities of BWP Consultants is their unwavering commitment to client satisfaction. They prioritise clear communication, ensuring that we were kept informed at every stage of the project. Their ability to listen carefully and adapt to our specific needs and preferences made the entire process seamless and stress-free.  The team’s innovative solutions and meticulous planning have consistently exceeded our expectations. BWP Consultants excel in creating sustainable and efficient designs that not only meet but often surpass industry standards.  BWP Consultants have proven themselves to be an outstanding partner in the realm of building and project consultancy. Their professionalism, expertise, and dedication to excellence make them a true asset to any project. I wholeheartedly recommend BWP Consultants.”

© BWP | Building & Project Consultants | Private Limited Company No. 10377919 | VAT: 253 6550 05